The Curtis Institute of Music's Albums
Mat Pour
November 14, 2009
The Curtis Institute of Music's Albums > Mat Pour
On Saturday, November 14, beginning at 1:30 a.m. in rain and ending about twelve hours later, concrete was poured to form the mat foundation of Lenfest Hall. A total of 1350 cubic yards of concrete was poured (nine cubic yards per truck; 150 trucks). There were two pumps on the site, each of which could accommodate two trucks at a time.

Photos courtesy of Alan Razak/Razak Company and an anonymous shutterbug.
image



image



image



image



image



image



image



image



image



image



image



image



image



image



image



image



image



image

Elevator shaft (basement)


image

From Locust Street to Latimer


image

From Latimer Street, with St. Mark's on Locust